Grouting & Foundation Works Australia Grouting & Foundation Works Australia
  • Home
  • News
  • Staff
  • Ground Treatment
    • Waterproofing
    • Rock Grouting
    • Soil Treatment
  • Projects
    • Buildings
    • Dams
    • Tunnels
    • Mining
    • Pipeline
    • Blasting
  • Contact

Projects

Engineering Panel of Experts - Lesotho Highlands Phase II (2)

Details
David Lees
Projects
15 July 2025
Hits: 60
Empty
  •  Print 
  • Email

David attended the 6th Mission of the Lesotho Highlands Phase II Engineering Panel of Experts (EPoE) as the Tunnelling and Grouting Expert in July 2025

The dam is now underway and the first TBM is excavating the access adit with the 2nd TBM just arriving on site.

 


  • Next

Featured Articles

  • 3 Mineapolis Crescent, Maroubra
  • After the earthquakes
  • AGS Seminar - Adelaide
  • ATS Presentation - Melbourne Victoria
  • ATS Presentation Brisbane

David Lees & Associates

  • About DL&A
  • Projects
  1. You are here:  
  2. Home
  3. Projects
  4. Engineering Panel of Experts - Lesotho Highlands Phase II (2)
Copyright © 2025 Grouting and Foundation Works Australia. All Rights Reserved. Designed by JoomlArt.com. Joomla! is Free Software released under the GNU General Public License.
Bootstrap is a front-end framework of Twitter, Inc. Code licensed under MIT License. Font Awesome font licensed under SIL OFL 1.1.