The Tanahu Hydropower Project in Nepal includes two 11.4m diameter diversion tunnels, a 1.4km 7m diameter headrace tunnel, a 60m high coffer dam, a 140m high mass concrete dam, an underground power house and a 33km transmission line.

The project consist of a 140MW hydropower plant with significant water storage facilities.