David Lees has been appointed as the Grouting Expert on the Panel of Experts for the Lesotho Highlands Water Project Phase II
Phase II of the project includes a 5.2m diameter, 32km long transfer tunnel to be excavated by drill and blast and TBM, the 165m high Polihali rock fill dam and 6.3km of tunnels of 11.5m diameter.