GFWAust were appointed to grout behind the corrugated iron lining following refurbishment work on the Pyes Creek conduit.
Ford Civil were awarded the contract to refurbish the conduit beneath New Line Road by placing a concrete invert over the worn and perforated linier. Whilst cuting out the old section of liner in the floor a void was identified up the side of the conduit. GFWAust were asked to pressure grout this void. A precison non-shrink grout was used to fill the void.