Back in the TransGrid cable tunnel
GFWAust were once again asked to clean the TransGrid cable tunnel in December 2012, we were also contracted to install a 63mm diameter water supply for the full 3.5km of the main tunnel. The water pipe was suspended on stainless steel brackets on the sidewall.